|
|
Hot wire compass for cutting lift duct. |
|
|
30" lift duct cut and plug removed. |
|
|
Cockpit walls cut and placed in for test fitting. |
|
|
Side view of walls in place. |
|
|
|
Bow sanded to shape and ready to glass. |
|
|
Thrust duct. 4-1" layers wrapped around a 60" form. |
|
|
Cutting thrust duct to shape |
|
|
Thrust duct cut to rough in. |
|
|
|
Duct mounted on engine stand for prop center position when mounting in craft. |
|
|
Glassing the inner duct wall. |
|
|
Great Stuff can spray foam used to glue cockpit walls in place. |
|
|
Walls in place. Scored 1/2 way though with a skill saw to allow the foam to bend inwards as it goes back. |
|
|
|
Air flow directors being installed for side scoops. |
|
|
Side view of intake scoop. |
|
|
intake scoop test fitted on the craft. |
|
|